Install 2 SBR Stacks in Parallel – Get 1 Free SBR Accessory Kit!
Activity:
For any brand-new installations of two (2) SBR battery stacks (starting from SBR128 or above per stack) in parallel from 25th Nov 2025 onwards in Australia, the installer will be eligible to claim a free SBR Accessory Kit. This program will end on 31st December 2025, or may be extended with prior notice.
How it works:
Apply via the form below. Once approved, Sungrow will dispatch a free SBR Accessory Kit to the address provided, and a tracking number will be shared upon dispatch.
Terms and Conditions:
- Eligibility: Installations must include two brand-new SBR battery stacks( SBR128 or above per stack) installed in parallel on or after 25th November 2025. A new SBR stack installed in parallel with an existing stack is not eligible.
- The newly installed SBR parallel stacks must be connected to iSolarCloud, and installation date shall be aligned with the date provided in the BTSC assignment form.
- Bouns: (1) SBR Accessory Kit for per eligible parallel stacks will be dispatched, free of charge, for approved applications.
- Delivery: The applicant must ensure proper delivery acceptance and sign the Proof of Delivery (POD). Sungrow will not be held responsible once the POD has been signed.
- Sungrow may reject a claim if the uploaded evidence is deemed invalid or duplicated, or may request additional supporting information. The site address provided in the BSTC assignment form must match the location where the connected hybrid inverter is installed.
- The terms and conditions are subject to change without prior notice. Sungrow reserves the right to interpret and administer the program at its sole discretion.
