Sungrow Australia and New Zealand Service
Sungrow Australia and New Zealand Service
Knowledge Base HV Hybrid Systems (SHRT&SHRS&HV Battery)
SH5.0RT/SH10RT/SH5.0RS
SBR096, SBR128, SBR160, SBR192, SBR224 and SBR256
Pre-Commissioning
Post-Commissioning
SHxRS Videos
Off-Grid Documents
SHxRT Videos
User Manuals
Pre-Commissioning

Technical Notes

3 Phase Hybrid SHxRT Docs (Installers only)

General Information (Installers only)

1 Phase Hybrid SHxRS Docs (Installers only)

Post-Commissioning

Troubleshooting (Installers only)


SHxRS Videos

SH RS Series Commission_202202


SH RS Series RS485 and CAN Connector_202202

SH RS Series Parallel Meter Connection

_202202

Sungrow SBR HV Battery Installation


Sungrow S100 Install Video


SH5.0RS Commission with Parallel Settings

_202203
SHxRT Videos

3-Phase Hybrid Inverter (SHxRT) - Installation

SH RT Series Initialise and set to Master Parallel - Installation_202203

SH RT Series_Commission_202202


SH RT Series_Slave settings and Initialise_202203

RT Series Parallel Connection detail_202202

SH5.0RT Overview and Commissioning


Hybrid Set Existing System_202202


SBR Battery Installation


Sungrow SBR HV Battery Installation


User Manuals

1 Phase Hybrid Inverter (5/10 kW)

SBR HV Battery

3 Phase Hybrid Inverter (5/10 kW)

Energy Meter

Off-Grid Documents