Sungrow Australia and New Zealand Service
Sungrow Australia and New Zealand Service
Knowledge Base HV Hybrid Systems (SHRT&SHRS&HV Battery)

SH5.0RS/ SH6.0RS/ SH8.0RS/ SH10RS

SH5.0RT/ SH10RT/ SH15T/ SH20T/ SH25T

SBR096/ SBR128/ SBR160/ SBR192/ SBR224/ SBR256

SBH200/ SBH250/ SBH300/ SBH350/ SBH400


Pre-Commissioning
Post-Commissioning
SHxRS Videos
SHxRT Videos
User Manuals
Pre-Commissioning
Post-Commissioning

Installation Guide

3 Phase Hybrid Docs

1 Phase Hybrid Docs

General

Troubleshooting

Off-Grid Documents

SHxRS Videos

SH RS Series Commission_202202


SH RS Series RS485 and CAN Connector_202202

SH RS Series Parallel Meter Connection

_202202

Sungrow SBR HV Battery Installation


SBR battery water ingress prevention

Sungrow S100 Install Video


SH5.0RS Commission with Parallel Settings

_202203
SHxRT Videos

3-Phase Hybrid Inverter (SHxRT) - Installation

SH RT Series Initialise and set to Master Parallel - Installation_202203

SH RT Series_Commission_202202


SH RT Series_Slave settings and Initialise_202203

RT Series Parallel Connection detail_202202

SH5.0RT Overview and Commissioning


Hybrid Set Existing System_202202


SBR Battery Installation


Sungrow SBR HV Battery Installation


User Manuals

1 Phase Hybrid Inverter (5/10 kW)

3 Phase Hybrid Inverter (5/10 kW)

SBR HV Battery

Energy Meter